NJ Fishing Advertise Here at New Jersey's Number 1 Fishing Website!


Message Board


WHAT a CLUSTER F - NJFishing.com Your Best Online Source for Fishing Information in New Jersey


Message Board Registration       FAQ

Go Back   NJFishing.com Your Best Online Source for Fishing Information in New Jersey > NJFishing.com Salt Water Fishing
FAQ Members List Calendar Mark Forums Read

NJFishing.com Salt Water Fishing Use this board to post all general salt water fishing information. Please use the appropriate boards below for all other information. General information about sailing times, charter availability and open boats trips can be found and should be posted in the open boat forum.

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 08-26-2016, 06:27 PM
hammer4reel's Avatar
hammer4reel hammer4reel is online now
NJFishing.com Old Salt
 
Join Date: Mar 2008
Posts: 4,400
Default WHAT a CLUSTER F

Here is the latest release on the dredging of Shark River.
see bottom.
It is scheduled to start Sept 1 prox.
There will be some weekday channel interruptions.
We are also waiting for a "recovery plan" and we are very concerned
that without additional resources $$$ this project will NOT be completed as the bid was originally awarded.
It will be very important the the back channel Spur is fully included.
There is a pumpout station there and it is the source of
high water pollutants especially after a rainfall.
We need the water flushed with the tide changes.
Stay tune for further info. JFD
NOTICE TO MARINERS
Mobile Dredging and Pumping and the New Jersey Department of Transportation Office of Maritime Resources will close a portion of the Shark River channel from September 1, 2016 until on or about September 23, 2016. In accordance with the schedule below.
The portion of the channel to be closed to navigation during dredging operations will be from 40°10'54.20"N, 74° 1'51.05"W to 40°11'6.87"N, 74° 1'53.54"W Monday 9 AM through Thursday 9 PM.
Thursday 9 PM through Monday 9 AM – Channel open but with on-going active dredging operations. During this period mariners are urged to transit at their slowest safe speed, with no wake, and no meeting or passing of other vessels. Mobile Dredging and Pumping may request to enact additional channel closures if the safety of operations cannot be maintained through operational dredging periods.
In addition there will be no Channel Closure on Labor Day. No Channel Closures Permitted 6:00 AM Friday, September 2, 2016 until Noon Tuesday September 6, 2016.
The dredging will be performed by the cutter suction Dredge # D-40 and will be assisted by the vessels WB-24. All pipelines will be marked with buoys and lighted. The dredge and other associated vessels will monitor VHF channels 6, 13 and 16. All mariners should take care to avoid the dredging operations as well as the associated pipelines.
Please include the following additional information in the Notice to Mariners Broadcast “During periods when the channel is open to navigation, mariners are urged to transit at their slowest safe speed to minimize wake and proceed with caution after passing arrangements have been made. Mariners must communicate clearly, and in advance, with the dredge via appropriate VHF channels.”
Mariners should also be advised that State Aids to Navigation (ATON) will be removed for the duration of the project. All mariners, including those utilizing human powered craft, should be especially alert to project pipeline routes and crossings.
__________________
Captain Dan Bias
Reelmusic IV

Fifty pound + , Striped Bass live release club
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 12:00 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2025, vBulletin Solutions, Inc.